Home > Products > Other Equipment >
Bucket elevator




Bucket elevator

  • pitch of buckets (mm) : 500-688
  • Material size (mm) : ﹤30
  • Bucket Elevator has the advantages of large conveyors, high elevating height, stable and reliable operation, and long service life.
 
Product profile
Bucket Elevator has the advantages of large conveyors, high elevating height, stable and reliable operation, and long service life. Its main parameters are in line with JB3926-85 "vertical Bucket Elevator" (this standard is equivalent to international standards and advanced foreign standards), the traction ring chain conforms to MT36-80 "high strength circular chain for mining", the elevator is suitable for conveying powder, Granular and small blocks of raw materials, such as coal, cement, stone, sand, clay, ore, etc. as the traction mechanism of the hoist is a circular chain,so it is allowed to transport materials at higher temperatures (material temperatures not exceeding 250 ℃). The general conveying height can reach up to 40 meters. The TG model can reach a maximum of 80 meters. 

 

Technical Data

Model  Capacity
(m³/h)
Speed
(m/s)
Material size
(mm)
Volume Of Bucket
(L)
pitch of buckets
(mm)
ZH Sh Zh Sh
TH210 20 33 1.4 ﹤30 2.5 5 500
TH315 35 60 1.4 ﹤35 3.7 6 512
TH400 58 94 1.4 ﹤40 5.9 9.5 512
TH500 75 118 1.5 ﹤50 9.3 15 688
TH630 114 185 1.5 ﹤60 14.6 23.6 688

Benefits

Working principle
The hopper scoops the material from the storage , as the conveyor belt or chain rises to the top, bypasses the top wheel and turns down. The Bucket Elevator empties the material into the receiving slot. The driving belt of the bucket elevator  is usually rubber belt, which is mounted on the lower or upper transmission drum and the upper and lower direction roller. Chain-driven bucket elevators are generally equipped with two parallel transmission chains, with a pair of transmission sprocket wheels above or below and a pair of reversing chain wheels below or above. Bucket Elevator is generally equipped to prevent dust in the bucket elevator. 
 